The Fermenters Have Arrived!

The Fermenters Have Arrived!

The Fermenters Have Arrived! Well after five months of back and forth with the supplier in China, waiting for fabrication to complete and then waiting for the slow boat from China, my fermenters have arrived! Quite exciting as part of me wasn’t sure they would as I have never imported anything before. They were delivered a couple […]

Brewery Mechanical Design – 200L Brewhouse

Brewery Mechanical Design – 200L Brewhouse

Brewery Mechanical Design The brewery mechanical design is completed once we have finalised the process design. The mechanical design is broken up into parameter specification, 3D concept drawing, fabrication drawings and assembly. List The Key Parameters Set the layout to achieve what we want after identifying the key parameters: Hard piped process lines that drain to […]

Brewery Commissioning – Test Batch #1 – Pale Ale

Brewery Commissioning – Test Batch #1 – Pale Ale

Brewery commissioning and recipe testing – Australia Day 2018 Time to test the new 2HL brewery with some grain! After 12 months of brewery design and build came the fun part on Australia Day 2018. The first brewery commissioning day went really well. The whole process was tested and performed as intended hitting most of our targets. […]